BHI
BHI, a Korean company in Nuclear & power: members on the National Pension Service register, the change over the past year, a Banseog reading and the other companies of the same field.
- Field
- Nuclear & power
- Team in Korea
- 630 people · Sept 2026
- 11-month change
- +72 (+12.9%) · Growing fast
- Period
- Oct 2025 → Sept 2026
- Joined · left
- 144 people · 77 people
- Current stage
- Capacity build-out · large supply · Nov 14, 2026
- Korean page
- Full detail in Korean ↗
Source: National Pension Service · Sept 2026
BHI — a company turning LNG power and nuclear orders into headcount
- Where it stands
- Expansion stage — record orders are turning into revenue while design and fabrication staff grow
Consolidated revenue in 2025 was KRW 771.6 billion, up about 91%, and operating profit was KRW 73.3 billion, up 234%. New orders were about KRW 1.8 trillion, a record high.
Revenue in Q2 2026 was KRW 296.3 billion, up 75%, and operating profit was KRW 45.5 billion, up 123.1%.
According to NPS public data, headcount in September 2026 was 630. That is 72 more (12.9%) than in October 2025; over the same period 144 people joined and 77 left.
- Decisions within a year
- Kuwait HRSG: in September 2026 it signed a KRW 145.3 billion supply contract to fabricate and supply four heat recovery steam generators (HRSGs) for a combined power and desalination plant.
- Domestic LNG combined cycle: in September 2026 it disclosed a KRW 223.5 billion power equipment supply contract with Korea Western Power.
- Water electrolysis: in June 2026 it developed Korea's first 2 MW-class alkaline electrolysis single stack.
- People it looks for
- HRSG and boiler design engineers — Middle East and domestic LNG combined-cycle orders are entering design at the same time
- Nuclear equipment quality and fabrication managers — nuclear equipment revenue is growing
- Overseas project managers (PMs) — schedules and delivery dates must be managed with Middle East EPC customers
HRSG and boiler design, nuclear equipment quality experience and Middle East EPC project experience are what this company values most right now.
Doosan Enerbility and domestic and overseas HRSG and nuclear equipment makers are looking for the same design and quality staff. It is better to fill PM and quality lead roles now, before the large orders move into fabrication.
Source: Etoday 2026-02-06 (2025 results and orders), 2026-08-14 (Q2 results), 2026-09-02 (Kuwait order), 2026-09-17 (Korea Western Power disclosure), 2026-06-29 (electrolysis stack)
Members month by month
| Month | Members | Joined | Left |
|---|---|---|---|
| Oct 2025 | 558 | 12 | 3 |
| Nov 2025 | 563 | 8 | 5 |
| Dec 2025 | 570 | 12 | 6 |
| Jan 2026 | 577 | 13 | 9 |
| Feb 2026 | 574 | 6 | 5 |
| Mar 2026 | 583 | 14 | 5 |
| Apr 2026 | 597 | 19 | 7 |
| May 2026 | 614 | 24 | 8 |
| Jun 2026 | 616 | 10 | 7 |
| Jul 2026 | 624 | 15 | 7 |
| Aug 2026 | 623 | 6 | 10 |
| Sept 2026 | 630 | 17 | 8 |
Other companies in Nuclear & power
| Company | Team | 11-month change | Trend |
|---|---|---|---|
| Doosan Enerbility | 5,990 | +276 (+4.8%) | Growing |
| Soosan Industries | 1,106 | +55 (+5.2%) | Growing |
| Iljin Power | 664 | +14 (+2.1%) | Steady |
| Woori Technology | 154 | −2 (−1.3%) | Steady |
| Hanil Nuclear | 117 | −30 (−20.4%) | Shrinking |
| KEPID | — | — | No data |
| Geumhwa PSC | — | — | No data |
| Orbitech | — | — | No data |
| Woojin NTEC | — | — | No data |
| KEPCO KPS | — | — | No data |