Enercon Korea
Enercon Korea, a Korean company in Renewables: members on the National Pension Service register, the change over the past year, a Banseog reading and the other companies of the same field.
- Field
- Renewables
- Team in Korea
- 33 people · Sept 2026
- 11-month change
- +10 (+43.5%) · Steady
- Period
- Oct 2025 → Sept 2026
- Joined · left
- 14 people · 4 people
- Korean page
- Full detail in Korean ↗
Source: National Pension Service · Sept 2026
Enercon Korea — the Korean field window for German direct-drive wind turbines
- Where it stands
- Staffing build-up stage — domestic headcount grew by more than 40% in one year
According to NPS public data, it had 33 members in September 2026, 10 more (43.5%) than in October 2025. In between, 14 people joined and 4 left.
In 2021 Enercon installed seven E-138 EP3 turbines (29.4 MW) at a resident-owned wind farm on Jaeun Island in Sinan, South Jeolla.
In 2024 it erected three E-160 EP5 turbines (16.68 MW) at the Parang wind farm, and the company said this was Korea's first E-160 EP5 and the first e-nacelle installation in the Asia-Pacific region.
- Decisions within a year
- Yield+ output upgrade (German headquarters): on September 24, 2026, it launched a control optimization that raises the rated output of the E-138 EP3 E3 model from 4.26 MW to 4.5 MW. Annual energy yield rises by about 2%, it can be applied to existing turbines without hardware changes if they have FTQ or FTQS electrical configurations, and the company said it plans to extend it to other models in turn.
- Expansion of heavy installation equipment (German headquarters): to install the 7.0 MW-class E-175 EP5 E2, it brought in a 1,000-tonne Liebherr LR 11000 crawler crane in summer 2026, adding to its six existing large cranes.
- People it looks for
- Wind turbine service and maintenance engineers — maintaining domestic operating wind farms and applying headquarters' output upgrade products to existing turbines in the field
- Wind installation project managers — managing transport on narrow, steep mountain access roads and installation with large cranes
- Technical sales and permitting staff — proposing large onshore models to power producers and meeting grid and permitting conditions
Installation and maintenance experience at mountain onshore wind sites, and maintenance experience with gearless (direct-drive) turbines or power electronics equipment, are what this company values most right now. Because it works with the German headquarters, the ability to exchange technical information in English also matters.
Wind service engineers and installation PMs are sought by domestic and foreign turbine makers, specialist wind O&M companies and public power companies. With headcount up sharply in one year, the first step now is to put in place field leads who can lead the new team.
Source: ENERCON reference (Jaeundo resident wind 29.4 MW, 2021), ENERCON reference (Parang wind farm 16.68 MW, 2024), ENERCON press release 2026-09-24 (Yield+), ENERCON press release 2026-09-24 (LR 11000 crane), NPS public data (members in September 2026)
Members month by month
| Month | Members | Joined | Left |
|---|---|---|---|
| Oct 2025 | 23 | 1 | 0 |
| Nov 2025 | 23 | 0 | 0 |
| Dec 2025 | 23 | 0 | 1 |
| Jan 2026 | 23 | 1 | 1 |
| Feb 2026 | 25 | 3 | 0 |
| Mar 2026 | 27 | 2 | 0 |
| Apr 2026 | 28 | 1 | 1 |
| May 2026 | 30 | 3 | 0 |
| Jun 2026 | 31 | 1 | 0 |
| Jul 2026 | 32 | 1 | 1 |
| Aug 2026 | 33 | 2 | 0 |
| Sept 2026 | 33 | 0 | 0 |
Other companies in Renewables
| Company | Team | 11-month change | Trend |
|---|---|---|---|
| Hanwha Qcells | 1,871 | −226 (−10.8%) | Shrinking |
| SK Oceanplant | 520 | −48 (−8.5%) | Shrinking |
| Unison | 139 | +3 (+2.2%) | Steady |
| Vestas Korea | 121 | −14 (−10.4%) | Steady |
| CS Wind | 93 | −3 (−3.1%) | Steady |
| Enlighten | 60 | −3 (−4.8%) | Steady |
| Daemyung Energy | 55 | +3 (+5.8%) | Steady |
| Copenhagen Offshore Partners Korea | 53 | −3 (−5.4%) | Steady |
| CS Bearing | 29 | +1 (+3.6%) | Steady |
| Solarplay | 19 | +6 (+46.2%) | Steady |
| Kumyang Green Power | — | — | No data |
| Shinsung E&G | — | — | No data |
| Taewoong | — | — | No data |
| Samil C&S | — | — | No data |