Grid

Bosung Power Technology

Bosung Power Technology, a Korean company in Grid: members on the National Pension Service register, the change over the past year, a Banseog reading and the other companies of the same field.

Field
Grid
Team in Korea
No register data yet
Current stage
Capacity build-out · large supply · Nov 14, 2026
Korean page
Full detail in Korean ↗

Source: National Pension Service

Banseog reading

Bosung Power Technology — making towers for both KEPCO transmission lines and private power plants

Banseog Search · Nov 26, 2026
Where it stands
Large-supply stage — KEPCO transmission line and private power plant tower contracts overlap

At its headquarters and plant in Chungju, North Chungcheong, and its Energy Valley plant in Naju, South Jeolla, it makes steel pipe transmission towers, steel pipe poles and tubular supports, as well as pole-mounted transformers and gas-insulated switchgear.

Its towers go to KEPCO (steel pipe towers for the East Coast–Singapyeong transmission line) and to private electrical contractor Sean E&C (towers for the Eumseong natural gas power plant transmission line). It supplies two markets together: KEPCO transmission lines and grid connection for private power plants.

In the same city of Chungju, the companies that added staff over the past year are Reyon Pharmaceutical Chungju Plant (+27, bio), Kolon Life Science Chungju Plant (+12, bio) and Chunbo New Materials Yeongpyeong Plant (+4, energy materials). Production and quality management experience connects with the plants in the same area, even across industries.

Decisions within a year
  1. On September 30, 2025, it signed an additional supply contract with KEPCO for steel pipe towers on the East Coast–Singapyeong transmission line.
  2. On October 15, 2025, it signed a tower supply contract with Sean E&C for the Eumseong natural gas power plant transmission line.
  3. On February 6, 2026, it filed a corrected disclosure changing the contract period of the East Coast–Singapyeong steel pipe tower contract signed in September 2024.
People it looks for
  1. Tower production management and welding quality staff — producing the additional East Coast–Singapyeong volume and the Eumseong transmission line volume
  2. Transmission structure design engineers — project-specific design of steel pipe towers and tubular supports
  3. Delivery and schedule managers — managing delivery schedules that reflect the changed contract period
For job seekers

Experience in transmission tower or steel structure fabrication, or in handling KEPCO delivery inspections, connects directly with this company's current contracts.

For hiring teams

The disclosed production sites are Chungju and Naju. Setting the work location for each contract first aligns the applicant pool, and within Chungju the bio and materials plants that added staff over the past year also employ people with production and quality experience.

Source: Bosung Power Technology business report (KIND 2026-03-19), quarterly report (2026), corrected disclosure on contract period change (2026-02-06), company website, NPS-registered workplaces (2025-09 → 2026-09)

01

Other companies in Grid

CompanyTeam11-month changeTrend
LS ELECTRIC3,430+144 (+4.4%)Growing
Hyosung Heavy Industries3,160+191 (+6.4%)Growing
LS Cable & System2,214+103 (+4.9%)Growing
HD Hyundai Electric2,003+19 (+1.0%)Steady
Taihan Cable & Solution1,402+132 (+10.4%)Growing fast
Iljin Electric1,075+1 (+0.1%)Steady
Sanil Electric341+57 (+20.1%)Growing fast
Hitachi Energy Korea248+29 (+13.2%)Growing
Jeryong Electric178−10 (−5.3%)Steady
Cheil Electric——No data
Vitzro Electric——No data
Kwang Myung Electric——No data
Sam Dong——No data
TC Materials——No data
LUXCO——No data

All energy companies →

Request a searchPeople who have done the same work as at Bosung Power Technology, found in Korea.Banseog Search →The energy packEight modules of Korean energy and which companies are adding people.Banseog Energy →Korean pageMonthly chart, filings, official postings and recent events, in Korean.banseog.co.kr →