Kwang Myung Electric

Kwang Myung Electric, a Korean company in Grid: members on the National Pension Service register, the change over the past year, a Banseog reading and the other companies of the same field.

Field
Grid
Team in Korea
No register data yet
Current stage
Capacity build-out · large supply · Nov 14, 2026
Korean page
Full detail in Korean ↗

Source: National Pension Service

Banseog reading

Kwang Myung Electric — a company supplying switchboards to semiconductor plants, nuclear plants and railway sites

Banseog Search · Nov 26, 2026
Where it stands
Project supply stage — following nuclear plants, it has taken on motor control centers for a semiconductor plant

It makes switchgear, switches and circuit breakers at its head office and Banwol plant in Danwon-gu, Ansan, Gyeonggi Province, and switches at its Naju plant in South Jeolla Province, and supplies motor control centers (MCC) to private and public projects.

Its motor control centers went to Korea Hydro & Nuclear Power's Shin Hanul Units 3 and 4 and to Samsung C&T's Pyeongtaek P5 construction, and its switchgear to DL E&C's GTX-A site. Nuclear plants, a semiconductor plant and a railway all sit among one company's delivery destinations.

In the same city of Ansan, the companies that added staff over the past year are Daeduck Electronics (+228, semiconductors), Sanil Electric (+57, energy) and TLB (+9, semiconductors). Sanil Electric is also listed on Banseog Energy.

Decisions within a year
  1. Shin Hanul: on March 18, 2025, it signed a contract with Korea Hydro & Nuclear Power to supply motor control centers for Shin Hanul Units 3 and 4.
  2. GTX-A: on June 30, 2026, the switchgear supply project for DL E&C's GTX-A site ended, and the company reported completion of delivery.
  3. Pyeongtaek P5: on September 22, 2026, it signed a contract with Samsung C&T to supply motor control centers for the Pyeongtaek P5 construction.
People it looks for
  1. Switchboard design engineer — handling Pyeongtaek P5 motor control center specifications
  2. Nuclear equipment quality specialist — delivery of motor control centers for Shin Hanul Units 3 and 4
  3. Project delivery and site coordination — shipping and support matched to construction companies' site schedules
For job seekers

Experience in motor control center or switchgear design, nuclear equipment quality documentation, or deliveries to large construction sites connects directly with this company's three delivery destinations.

For hiring teams

Semiconductor plants, nuclear plants and railway sites are all delivery destinations for this company. When looking for switchboard design and quality staff, deciding first which project they take on sharpens the experience criteria; Sanil Electric in the same city of Ansan also added staff over the past year.

Source: Kwang Myung Electric annual report (KIND 2026-04-07), Pyeongtaek P5 supply contract disclosure (2026-09-22), GTX-A supply contract disclosure (2025-06-24), semiannual report (2026), Shin Hanul contract-related disclosure (KIND 2025-08-14), quarterly report (2026-11-13), National Pension Service (NPS) enrolled workplaces (2025-09 → 2026-09)

01

Other companies in Grid

CompanyTeam11-month changeTrend
LS ELECTRIC3,430+144 (+4.4%)Growing
Hyosung Heavy Industries3,160+191 (+6.4%)Growing
LS Cable & System2,214+103 (+4.9%)Growing
HD Hyundai Electric2,003+19 (+1.0%)Steady
Taihan Cable & Solution1,402+132 (+10.4%)Growing fast
Iljin Electric1,075+1 (+0.1%)Steady
Sanil Electric341+57 (+20.1%)Growing fast
Hitachi Energy Korea248+29 (+13.2%)Growing
Jeryong Electric178−10 (−5.3%)Steady
Cheil Electric——No data
Vitzro Electric——No data
Bosung Power Technology——No data
Sam Dong——No data
TC Materials——No data
LUXCO——No data

All energy companies →

Request a searchPeople who have done the same work as at Kwang Myung Electric, found in Korea.Banseog Search →The energy packEight modules of Korean energy and which companies are adding people.Banseog Energy →Korean pageMonthly chart, filings, official postings and recent events, in Korean.banseog.co.kr →