Grid

LS Cable & System

LS Cable & System, a Korean company in Grid: members on the National Pension Service register, the change over the past year, a Banseog reading and the other companies of the same field.

Field
Grid
Team in Korea
2,214 people · Sept 2026
11-month change
+103 (+4.9%) · Growing
Period
Oct 2025 → Sept 2026
Joined · left
403 people · 278 people
Current stage
Plants abroad · localizing · Nov 14, 2026
Korean page
Full detail in Korean ↗

Source: National Pension Service · Sept 2026

Banseog reading

LS Cable & System — a company crossing to the US together with a subsea cable plant

Banseog Search · Oct 25, 2026
Where it stands
Expansion stage — domestic HVDC and a US subsea cable plant are calling for people at the same time

In the first half of 2026 it recorded revenue of KRW 4.5232 trillion (+18% from the same period a year earlier) and operating profit of KRW 238.4 billion (+44%). Orders for extra-high-voltage subsea cables and busducts for US AI data centers drove the results.

According to National Pension Service (NPS) public data, headcount at LS Cable & System's workplaces was 2,214 as of September 2026, up 103 (4.9%) from October 2025. Over the same period 403 people joined and 278 left.

Decisions within a year
  1. Subsea cable plant in Virginia, US: in June 2026 its US production subsidiary LS GreenLink broke ground on a 201 m vertical continuous vulcanization (VCV) tower in the city of Chesapeake. The targets are completion in the second half of 2027 and commercial production in the first quarter of 2028.
  2. East Coast–Seoul metropolitan area HVDC Phase 2: in June 2026 it won KEPCO's HVDC Phase 2 project for the East Coast–East Seoul section on a turnkey basis for about KRW 146 billion. It uses 525 kV HVDC cable.
  3. Review of Donghae Subsea Plant 1: in October 2026 it disclosed that it is reviewing several options, including sale or relocation, for subsea cable Plant 1 at its Donghae site in Gangwon Province. Nothing has been decided yet.
People it looks for
  1. Overseas plant start-up and production leader — stabilizing equipment and building the local organization at the Virginia plant, which targets commercial production in Q1 2028
  2. HVDC project manager — managing the design, manufacturing and installation schedule of national grid turnkey projects
  3. Subsea cable quality and process engineer — relocating domestic subsea production bases and transferring processes to the new US facility
For job seekers

Experience in extra-high-voltage or HVDC cable manufacturing, starting up an overseas plant, or managing large grid turnkey projects is what this company values most right now.

For hiring teams

Domestic cable makers such as Taihan Cable & Solution, overseas cable makers and offshore wind installers are all looking for the same extra-high-voltage and subsea cable staff. Now, a year before the Virginia plant's completion, is the time to hire the production and quality leaders who run local operation.

Source: KET 2026-08-14 and Insight 2026-08-20 (first-half results), eToday 2026-06-25 (Virginia plant), Dailian 2026-06-15 (HVDC Phase 2), News Journalism 2026-10-12 (Subsea Plant 1 review disclosure)

01

Members month by month

MonthMembersJoinedLeft
Oct 20252,1111539
Nov 20252,1336118
Dec 20252,1392565
Jan 20262,1255118
Feb 20262,1181119
Mar 20262,1727333
Apr 20262,1592024
May 20262,1491420
Jun 20262,1522320
Jul 20262,1926220
Aug 20262,2002821
Sept 20262,2143520
02

Other companies in Grid

CompanyTeam11-month changeTrend
LS ELECTRIC3,430+144 (+4.4%)Growing
Hyosung Heavy Industries3,160+191 (+6.4%)Growing
HD Hyundai Electric2,003+19 (+1.0%)Steady
Taihan Cable & Solution1,402+132 (+10.4%)Growing fast
Iljin Electric1,075+1 (+0.1%)Steady
Sanil Electric341+57 (+20.1%)Growing fast
Hitachi Energy Korea248+29 (+13.2%)Growing
Jeryong Electric178−10 (−5.3%)Steady
Cheil Electric——No data
Vitzro Electric——No data
Kwang Myung Electric——No data
Bosung Power Technology——No data
Sam Dong——No data
TC Materials——No data
LUXCO——No data

All energy companies →

Request a searchPeople who have done the same work as at LS Cable & System, found in Korea.Banseog Search →The energy packEight modules of Korean energy and which companies are adding people.Banseog Energy →Korean pageMonthly chart, filings, official postings and recent events, in Korean.banseog.co.kr →