DB HiTek 2 registered sites · South Korea
Recent changes at DB HiTek 2026-11-18 DB HiTek to acquire land and buildings in Gangnam for AI data center 2026-11-12 DB HiTek reports Q3 2026 consolidated operating results Banseog note / DB HiTek
A company adding next-generation power semiconductors on top of a fully utilized 8-inch line Current stage · from public events · 2026-11-14
R&D Qualification · first supply Capacity expansion Service · yield operations Overseas sites · local production M&A · integration Restructuring Qualification · first supply Preparation for initial mass production after completing reliability qualification of an 8-inch SiC process and providing customers with design kits
2026-09-09 The company announced completion of qualification for its 8-inch 1200 V SiC MOSFET process and provision of a PDK to customers. Source Roles often seen at this stage Process & devices · Quality & reliability · Chip design
Q2 2026 revenue was KRW 414.5 billion (+23%) and operating profit KRW 105.2 billion (+42.5%), for an operating margin of 25.4%. 87.7% of first-half revenue came from overseas, and it spent KRW 60 billion, 7.76% of revenue, on R&D. According to Korea's National Pension Service public workplace data, it had 2,209 people on the pension register in August 2026. Over the 11 months from September 2025 the number grew by 57 (+2.6%); in the same period 399 joined and 339 left, so turnover was high. Decisions within a year In September 2026 it said it had completed reliability verification of a 1200V SiC MOSFET process on 8-inch wafers. It is targeting volume production in 2027 and plans to release a third-generation process design kit (PDK) in November. In March 2026 it raised foundry prices by about 5%, and utilization on an input basis is 98%, effectively at capacity. In August 2026 it signed an agreement to transfer part of the 8-inch equipment at its Sangwoo Campus free of charge to a national research institute in the nano field. People they will look for SiC and GaN process and device engineers — the 8-inch 1200V SiC MOSFET must be moved into volume production in 2027 PDK and design support engineers — work continues on launching the third-generation PDK and widening customer validation Production and facilities engineers — the 8-inch line running at 98% utilization must be operated without stoppages For hiring managers Other foundries and power semiconductor companies are looking for the same power semiconductor and 8-inch process talent. With many people both joining and leaving, it is important to secure key process leaders now, a year before SiC volume production.
For job seekers Experience taking power semiconductor processes such as BCD or SiC through to volume production is what this company values most right now.
Banseog note · 2026-10-25 · An analysis written from public sources. Sources: News Tomato 2026-08-05 (Q2 results), Bloter 2026-09-04 (overseas revenue, R&D), Digital Daily 2026-09-09 (SiC verification, PDK), SmartBizN 2026-10-14 (prices, utilization), Electronic Times 2026-08-06 (equipment transfer). Headcount is from Korea’s National Pension Service public data (Korean workplaces).