Banseog note / NVIDIA
Tying together Korea's memory and AI factories Current stage · from public events · 2026-11-14
R&D Qualification · first supply Capacity expansion Service · yield operations Overseas sites · local production M&A · integration Restructuring Capacity expansion Expansion of Korea's GPU operating base through an announced AI factory infrastructure plan with NAVER and Brookfield Also seen: Overseas sites · local production
2026-07-24 The company announced plans with NAVER and Brookfield to expand the Sejong AI factory's capacity from an initial 55 MW to 200 MW by 2028. Source Roles often seen at this stage Software, data & IT · Equipment design, control & CS · Sales, FAE & marketing
Revenue for fiscal 2026 (ended January 2026) was USD 215.9 billion, up 65% year on year, of which data center revenue was USD 193.7 billion (+68%). Operating income was USD 130.4 billion (+60%). Revenue for the second quarter of fiscal 2027 (ended July 2026) was USD 96.2 billion, up 106% year on year, and data center revenue was USD 89.0 billion, up 117%. At the end of fiscal 2026 (January 2026) the company had about 42,000 employees worldwide (in 38 countries), of whom 31,000 work in research and development (annual report, 10-K). Decisions within a year SK hynix On June 7, 2026 the two companies announced a multi-year technology partnership to co-develop next-generation memory for AI factories. It covers joint development of memory for the Vera Rubin supercomputer, the Vera CPU and the Jetson Thor robotics platform, as well as using NVIDIA software to accelerate semiconductor design and manufacturing and fab digital twins.SK Group On July 25, 2026 the two sides signed a letter of intent for cooperation worth more than USD 500 billion (about KRW 730 trillion). SK Telecom will build a 2GW AI factory with Vera Rubin systems using NVIDIA's DSX platform and SK hynix HBM4, with construction starting in 2027.NAVER On July 25, 2026 it was announced that NVIDIA will invest USD 1 billion in NAVER's AI factory business and Brookfield will provide up to USD 9 billion. Capacity at the Sejong data center (GAK Sejong) will be expanded from 55MW to 200MW, using NVIDIA's Vera Rubin and Blackwell platforms.People they will look for Data center and solutions architects — large AI infrastructure builds are under way in Korea at the same time, such as SK Telecom's 2GW AI factory and NAVER's expansion to 200MW in Sejong Memory and systems collaboration engineers — next-generation memory must be co-developed with SK hynix, and HBM4 must be fitted to Vera Rubin systems Manufacturing AI and digital twin engineers — software collaboration with Korean manufacturing customers is growing, such as fab digital twins and accelerated chip design and manufacturing For hiring managers Engineers who understand both GPU infrastructure and AI software are sought at the same time by the AI divisions of Korean conglomerates, telecom and cloud companies, and the Korean subsidiaries of global semiconductor companies. Now, before AI factory construction starts (2027), is the time to secure people with build experience in Korea.
For job seekers Experience designing and operating large GPU clusters, or fitting high-performance memory such as HBM to systems, is what NVIDIA's Korean business values most right now.
Banseog note · 2026-10-25 · An analysis written from public sources. Sources: NVIDIA press release 2026-02-25 (fiscal 2026 results), NVIDIA press release 2026-08-26 (Q2 fiscal 2027 results, Korean partnerships), NVIDIA 10-K 2026-02-25 (headcount), NVIDIA and SK hynix press release 2026-06-07 (memory partnership), Herald Economy 2026-07-25 (SK Group letter of intent, SK Telecom AI factory), NAVER press release (PR Newswire) 2026-07-25 (NAVER, Brookfield and NVIDIA Sejong AI factory). Headcount is the company-stated global figure.
NVIDIA hiring trend NVIDIA lists 1,074 open postings on its official career site (checked Nov 19, 2026), 1,601 fewer than last week. Most hired roles: chip design 405, software, AI & IT 252, interns & graduates 154. Top cities: Yokneam 117, Shanghai 112, Bengaluru 104.
Posting counts are not headcount.
See the hiring trend →